Composite PMI: 57.5 vs 56 expected

  • Services PMI: 56.2 vs 55.1 expected, prior was 55.0
  • Manufacturing PMI prior was 58.5
  • Composite PMI prior was 56.0

We continue the logic string reading ,, I’m a bit long looking for a 1.1865 break for 1.1920

 

K-man
Latest posts by K-man (see all)

Pin It on Pinterest